The Montage is a complete dismantlement of the former Golden Phoenix Hotel and Casino structure except for the core elements:

  • Steel beams will remain in the ground level structure
  • Concrete ceilings and floors will remain in the tower
  • Three levels of below grade parking will house parking for 560 cars

The entire structure will then be rebuilt with:

  • New electrical, plumbing, HVAC and roof
  • Floor to ceiling windows
  • Spacious balconies
  • New centrally controlled Life Safety system
  • Completely refurbished elevator
    mechanical system and cabs

The base of the building will be re-engineered using new construction for the Rowhouses, Lofts and Terrace Townhomes. Two newly constructed floors will be added to the top of the tower for the Penthouses.