The
Montage is a complete dismantlement
of the former Golden Phoenix Hotel
and Casino structure except for
the core elements:
- Steel
beams will remain in the ground
level structure
- Concrete
ceilings and floors will remain
in the tower
- Three
levels of below grade parking
will house parking for 560 cars
The
entire structure will then be rebuilt
with:
- New
electrical, plumbing, HVAC and
roof
- Floor
to ceiling windows
- Spacious
balconies
- New
centrally controlled Life Safety
system
- Completely
refurbished elevator
mechanical system and cabs
The
base of the building will be re-engineered
using new construction for the Rowhouses,
Lofts and Terrace Townhomes. Two
newly constructed floors will be
added to the top of the tower for
the Penthouses.
|