Exterior/Views

Finishing touches continue on the exterior of the building; you may notice a few of the 32 surveillance cameras installed on the premises. The large white columns on the corner of 2nd and Sierra are installed, adding a dramatic architectural element to the building. Also featured below are views from one of our custom penthouse residences. Note the wall of glass and step-out terrace.

  • IMG 3848
  • IMG 3848
  • IMG 3946
  • IMG 3947
  • IMG 3966
  • IMG 3973
 


Lobby Finish Work
The lobby is looking absolutely stunning, with imported ceramic tile applied to the walls, and high-end lighting installed

  • IMG 3982
  • IMG 3997
 
Garden Deck
The dog run is complete and featured below. Extensive landscaping will transport you into your own private eden as you read a book, enjoy a drink with some friends, or play vicious game of tug of war with your dog in the dog run.

  • IMG 3862
  • IMG 3872
  • IMG 3874
  • IMG 3880
  • IMG 3883
  • IMG 3896
 

Pool Terrace
Installation of a motorized pool cover is complete, interior work on the owner's lounge is nearly done, and the gas elements for the fire pits are installed.

  • IMG 3900
  • IMG 3920
  • IMG 3936